Provides the Owner with input in the design phase while working with two (2) Parties
Provides the Owner with the least cost option; owner assumes responsibility with A/E for design to be correct.
Master Builder assumes role singular for all activities in the process; only one contract for the Owner to manage.
Copyright © 2022 MCS Construction - All Rights Reserved.
Powered by GoDaddy